Contract intelligence on call.
Adam reads your signed contract, tracks every time bar, drafts the notices, and builds the evidence trail before your position is lost. Built for South African construction professionals.
Ask Adam anything — deadlines, notices, cost, delay. No prompt writing needed.
Variation claim — Project Louw JHB
Owner: Principal Agent · Notice window closes in 3 days
Ready to serveWhat's inside
Every deadline tracked. Every position, provable.
Never miss a notice deadline
JBCC gives you 20 working days to notice a claim, and it forfeits that claim the moment you miss the window. Adam works from your contract, tracks every trigger, and tells you when to act.
Your contract has been amended. Do you know where?
Most SA contracts are amended. A schedule of special conditions can halve a time bar without ever changing the clause number. Adam reads your executed contract against the standard form and shows you exactly where yours differs.
Prove your delay claim, not just log it
Lock a baseline, run a real Time Impact Analysis, and get a dominant-cause concurrency test instead of a flat 50/50 guess. Export a Delay Claim Report ready for the other side's expert.
Know what you're signing before you sign it
Upload the contract you were sent and Adam flags the risks, shows what's still blank and needs completing, and answers your questions about that specific document. No project needed. Submitting a tender instead? Draft your Qualifications, the exclusions and commercial terms you attach to your own quote, before you've even sent it.
Inside the product
A command centre for every contract you run.
Pinned
Project Alpha
On programmeProject Beta
4d behindProject Gamma
On programmeModules
Project Alpha
JBCC 6.2 · Principal Building Agreement
3
Open time bars
5
Variations pending
R2.4m
Retention held
Recent activity
This is an illustrative preview. Project names shown are examples, not real client data.
Pre-signature
Protect your risk before you sign a contract.
NSC_Subcontract_Agreement.pdf
Uploaded before signing. No project needed.
6.8/10
Risk score
4
Flags found
3
Sections still blank
Red flags
Liquidated damages — uncapped
R5,000/day, no ceiling. Typical practice caps this at 10% of contract value.
Retention release — undefined
No mechanism specified for release on practical completion.
Commencement date — [TO BE INSERTED]
This is a blank field in the Schedule of Key Dates. It must be filled in before this document can be signed.
This is an illustrative preview. The document and flags shown are examples, not real client data.
Ask, and Adam answers
Every project has Adam built in.
What's inside
From first instruction to final account.
Contract Administration
Time bars, notices, claims, drawings, and letters of intent. This is the full admin lifecycle, from first instruction to final account.
Health & Safety
Incident register, site inductions, permits to work, compliance certifications, and inspections with real hold points. Your H&S file compiles itself from all of it.
Commercial & Closure
Variations, payments, disputes, insurance, close-out and defects. Every commercial register lives in one place.
Cost Control — Client
Every instruction tracked against the contract sum. AI-coded bills, vendor POs, and full client history across every project.
Cost Control — Contractor
Recover what you're owed. Baseline costs, work orders, subcontractor track record, and cash flow in one place.
Programme Management
Locked baselines and real Time Impact Analysis. Extension entitlement calculated forensically, not estimated.
Project Recovery
Distressed projects need a different playbook. Adam has one.
Built for the contracts you already use
South African construction contracts. South African law.